Friday, August 09, 2013

Planning Applications to 3 August 2013

The builders aren't on holiday.

2013/05246/PA - 295 Fox Hollies Road, B27 7PS
Display of 1 no. externally illuminated fascia sign and 3 no. graphic signs

2013/05556/PA - 66, 72, 167 Fox Hollies Road, B27 7TJ
Installation of external wall insulation

2013/05682/PA - 1285 Warwick Road, B27 6PX
Erection of 6 metre deep single storey rear extension. Maximum height 2.5 metres, eaves height 2.5 metres

2013/04062/PA - 1091 Warwick Road, B27 6QT
Change of use of first floor to dining area in conjunction with existing restaurant use at ground floor, and erection of single storey front extension, two storey rear extension and second floor extension to create residential flat at second floor.
(This one has come back again and the Ward Committee resolved to object to it when it last appeared)

2013/05684/PA - 108 Shirley Road, B27 7NA
Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

You can find the details by inputting the reference number into the Council online database here

If you have any comments, you can submit them online - feel free to pass your comments on to me.


Thursday, August 08, 2013

Road repairs - Bretton Road

As part of the ongoing investment in Birmingham's roads, Bretton Road (from Olton Boulevard East to Gospel Lane) will be resurfaced to repair joints and cracks in the concrete road.

The work is scheduled to start during the week of the 19-23 August 2013. It is expected to take up to five days and the crews will be working on site between 8am and 6pm. Amey will put signs on the road to confirm the precise start date.

As vehicles can't drive over hot tarmac, the section of the road affected will be closed to all traffic while surfacing is being carried out.

If you require access for medical/personal reasons, you can contact Amey on 0121 303 6644 (option 2), to discuss how access can be arranged. Pedestrian access will be maintained as well as access for emergency vehicles. That number can also be used for any other questions that you might have. 

During working hours, it will not be possible to park on the road. Cars left will have to be removed and this may incur a cost to the registered keeper. There are also likely to be speed and width restrictions while the work is carried out. 

Sorry for the inconvenience, but this work needs to be done and is usually completed well within the time allocated. 

Tuesday, August 06, 2013

Road repairs - Fanshawe Road

As part of the ongoing investment in Birmingham's roads, Fanshawe Road (from Circular Road to Pool Farm Road) will be resurfaced to repair joints and cracks in the concrete road.

The work is scheduled to start during the week of the 12-16 August 2013. It is expected to take up to five days and the crews will be working on site between 8am and 6pm on weekdays only. Amey will put signs on the road to confirm the precise start date.

As vehicles can't drive over hot tarmac, the section of the road affected will be closed to all traffic while surfacing is being carried out.

If you require access for medical/personal reasons, you can contact Amey on 0121 303 6644 (option 2), to discuss how access can be arranged. Pedestrian access will be maintained as well as access for emergency vehicles. That number can also be used for any other questions that you might have. 

During working hours, it will not be possible to park on the road. Cars left will have to be removed and this may incur a cost to the registered keeper. There are also likely to be speed and width restrictions while the work is carried out. 

Sorry for the inconvenience, but this work needs to be done and is usually completed well within the time allocated. 

Monday, August 05, 2013

Road repairs - Lyall Grove

As part of the ongoing investment in Birmingham's roads, Lyall Grove  will be resurfaced to repair joints and cracks in the concrete road.

The work is scheduled to start during the week of the 12-16 August 2013. It is expected to take up to five days and the crews will be working on site between 8am and 6pm on weekdays only. Amey will put signs on the road to confirm the precise start date.

As vehicles can't drive over hot tarmac, the section of the road affected will be closed to all traffic while surfacing is being carried out.

If you require access for medical/personal reasons, you can contact Amey on 0121 303 6644 (option 2), to discuss how access can be arranged. Pedestrian access will be maintained as well as access for emergency vehicles. That number can also be used for any other questions that you might have. 

During working hours, it will not be possible to park on the road. Cars left will have to be removed and this may incur a cost to the registered keeper. There are also likely to be speed and width restrictions while the work is carried out. 

Sorry for the inconvenience, but this work needs to be done and is usually completed well within the time allocated.